Project name: Majotini Community Water Supply Scheme
Client name: Microprojects Programme
Location: Majotini, Hhohho Region
 

Project description

The Majotini Community Water Supply Scheme is located in the Majotini/Lujingelo area of Nkaba. The scheme had been installed some years before, but due to the existing water source being insufficient the scheme had become obsolete. The project, therefore, involved the investigation of an alternative water source and a redesign, where necessary, of the existing system

ZMCK responsibilities

Services include the analysis of the existing system, locating the reservoir, geotechnical investigation of a borehole water source, contract documentation and supervision of construction. 

 

  • Building Structures
  • Construction Supervision
  • Community Water Supply
  • Dams
  • Detailed Designs
  • Feasibility Studies
  • Major Drainage Structures
  • Materials Investigation
  • River Bridges
  • Roads
  • Road Bridges
  • Road Condition Survery
  • Traffic Studies
  • Urban Development
    260 Ben Dunn Street Mbabane
    P.O. Box 2594, Mbabane

    Telephone: (+268) 2404-5321
    Fax: (+268) 2404-5138

    e-mail address: swaziland@zmck.co.sz

copyright © Expertype. all right reserved. Design by: Expertype Studio