Project name: | Proposed Development, Portion 24 of Farm 9, Peeble Block |
Client name: | Swaziland Perishable Foods (Daviot Farm) |
Location: | Manzini |
Project description
Infrastructural development to a virgin land covering 2.99 hectares. The development included the construction of a new steel framed supermarket with a floor area covering 460m2. A super maize mill steel framed warehouse covering 960m2 area with a 150m3 volume silo maize meal storage. The mill was equipped with machinery to produce 1.5 tonnes of mealie meal per hour.
A chicken abattoir warehouse to slaughtering 1 000 No. chickens a day. A 0.35km, of bituminous surfaced access roads with surfaced parking area, water reticulation including a reservoir and sewer reticulation with a septic tank
ZMCK responsibilities
Services provided include a geotechnical investigation, structural design of the warehouses and supermarket, detailed design of access roads and parking bay, water and sewerage reticulation systems, project management and construction supervision.